In April 2020, we signed a post-warranty service agreement for the SPA-2 line. In September, the haul-off unit failed because the supplier delivered low-quality raw materials. The staff of Ivanovo Mechanical Plant repaired the unit as quickly as possible and identified the cause of the failure in the process. The line is now fully operational, and production has resumed.
-
-
Technical Director G. V. Smirnov
TechnoStroy LLC





